RATES

New Rates Effective April 1, 2025

Below is a summary of all our current rates that were in effect since May 1, 2023.

Single Phase Service, Village (Rate 58) – Schedule A

Single Phase, alternation current at available secondary voltages.  Available to

Members residing in high density (incorporated Village/City) of at least 10

consumers per mile and average monthly usage exceeding 500 kWh’s per location.

View Tariff Sheet

Single Phase Service (Rate 78,80,88) – Schedule A

Single-phase alternating current at available secondary voltages.

View Tariff Sheet

Primary (Rate 63) – Schedule LP

Three-phase, alternating current at available standard voltages.

View Tariff Sheet

Controlled Electric Heat (Rate 70) – Schedule A-C

Single-phase, alternating current at available secondary voltages.  Available when

used in conjunction with Schedule A.

View Tariff Sheet

Heat Storage (Rate 73) – Schedule A-HS

Single phase, alternating current at available secondary voltages.  Available when

used in conjunction with any other rate schedule.

View Tariff Sheet

Controlled Heating & Air Conditioning (Rate 74) – Schedule A-IAC

Single phase, alternating current at available secondary voltages.  Available when

used in conjunction with Schedule A and with electric heat.

View Tariff Sheet

Single-Phase Time of Day (Rate 71,72) – Schedule A-TD

Single-phase, alternating current at available secondary voltages. 

View Tariff Sheet

Rural Three-Phase Power (Rate 79) – Schedule B

Three-phase, alternating current at available secondary voltages.

View Tariff Sheet

Electric Heat (Rate 81,82) – Schedule EH   CLOSED

Single-phase, alternating current at available secondary voltages.

View Tariff Sheet

Large Power Service (Rate 83) – Schedule LP

Three-phase, alternating current at available secondary voltages.

View Tariff Sheet

Large Power, Non-Firm Energy (Rate 84) Schedule LP

Three-phase, alternating current at available secondary voltages.

View Tariff Sheet

Rate 86 – Schedule GD  CLOSED 03/01/2013

Single-phase, alternating current at available secondary voltages.  This schedule is

available only where grain drying can be controlled through the load management

system.

View Tariff Sheet

Street Lighting (Rate 87) – Schedule SL-HPS

Single-Phase, alternating current at available secondary voltages.

100, 250 and 400 watt High Pressure Sodium Light

View Tariff Sheet